Besides simple aluminum products output, we offer
more for customers' requirement. Usually, the routine
we run the aluminum products as followsˇG
ˇEDrawing confirmation-
outlet and dimension
Before going on any new shapes, we'll examine
and discuss the critical structure with customers
since the designed shape by customer will, sometimes,
cause the failure or unstable quality during mass
production. Also, highly die charge will come out
for difficult die making like semi-hollow one.
That's why It
is important to check and make sure the drawing which will be workable
under a reasonable cost evaluation.
-LeadtimeˇG7 days (depending on profile
shape)
ˇEDie
making -
After drawing confirmation, die making will be the
following step to go.
-LeadtimeˇG2~3weeks
ˇESample testing
-
Testing the die by extruding the aluminum product
(sample), and checking the products to meet
the accepted tolerance.
-LeadtimeˇG1week
ˇESample confirmation
-
Sending out the sample to getting approval of client
by signing back the confirmation letter.
-LeadtimeˇG1 week (depending on the client)
ˇEMass
production -
After receiving customer's approval,
mass production will be started within agreed
leadtime.
-LeadtimeˇG3~6weeks (depending on the qty)
ˇEProcess -
-FabricationˇG Cutting, Punching, Drilling, Welding,
Sand -Blasting and CNC..
-Surfacing finishing: Anodizing, Coating
(colors)...
-PrintingˇGlogo printing on products
-LeadtimeˇG2~4weeks (dep. on machining work & qty)
ˇEPacking
-
Depending on the products specs and length. Normally
giving paper or PE bag, hard carton and wooden
pallet or case etc..