Added-service
222
Besides simple aluminum products output, we offer
more for customers' requirement. Usually, the routine
we run the aluminum products as followsˇG
ˇEDrawing confirmation-
outlet and dimension
Before going on any new shapes, we have to examine
and discuss the critical structure with customers
since the designed shape by customer will, sometimes,
cause the failure or unstable quality during mass
production. Also, highly die charge will come out
for difficult die making like semi-hollow one. It
is the reason, our engineers need to take time to
estimate and make sure the drawing which will be workable
under a reasonable cost balance.
-LeadtimeˇG7 days (depend cases)
ˇEDie
making -
After drawing confirmation, die making will be the
following step to go on.
-LeadtimeˇG7-10 days
ˇESample testing
-
Testing the die by extruding the aluminum product
(sample), and checking the products is good under
the accepted tolerance.
-LeadtimeˇG5-7 days
ˇESample confirmation
-
Sending out the sample as required specification of
customers, and getting back they confirmation to forward
mass production.
-LeadtimeˇG3-7 days
ˇEMass
production -
Finishing every step above with customer's confirmation,
it is time to run mass production in raw material
part.
-LeadtimeˇG7-15 days (depend the quantity)
ˇEProcess -
-FabricationˇG Cutting, Punching, Drilling, Welding,
Sand -Blasting..
-Surfacing finishing: Anodizing, Polishing, Coating
(colors)...
-PrintingˇGlogo printing on products
-LeadtimeˇG7-15 days (depend quantity)
ˇEPacking
-
The general material and service we offer in packing
including: labels printing, instrument, polybag, paper
carton, and wooden case





